Skip to content

Before winter ·Book a free fall roof check and ice dam assessment, with photos of every slope

Whitlock& Sons Roofing
Roofer carrying a bundle of asphalt shingles across a roof deck past stacked bundles

Roof Replacement · Gannet Point

A new roof built for the coast, not just the brochure

A roof near the water has to handle salt spray, wind-driven rain and freeze-thaw cycles that inland roofs never see. We strip to the deck, repair what is underneath and build the whole system to match where your house actually sits.

The job, one course at a time

  1. Gray shingle-sided cottage with black shutters, blue hydrangeas and a large shade tree in front
    1

    What goes into a Whitlock roof

    Every replacement starts with a full tear-off. Layering new shingles over old ones hides soft decking, adds weight and shortens the life of the new roof. Once the boards or plywood are exposed, we re-nail the deck, replace any rotted sections and check for sagging rafters, which are common in older Capes and saltboxes.

    From there we build the roof up in order: ice and water shield at the eaves and in every valley, synthetic underlayment across the field, new aluminum or copper drip edge, new step and counter flashing at walls and chimneys, and vents sized to your attic. Within a mile of salt water we use stainless or hot-dipped galvanized nails, because standard fasteners rust through long before the shingles wear out.

  2. 2

    Choosing a roof for your street

    Most of our replacements are architectural asphalt shingles rated for high winds, which is the best value for many homes. Waterfront and exposed hilltop houses often get a higher wind rating and six nails per shingle instead of four. Older homes in the village are a natural fit for cedar, and barns and outbuildings for standing seam metal.

    If your house is in a historic district, the material and color may need approval before we start. We know what the local commissions typically accept, bring full-size samples to your house and prepare the application with photos so the hearing is short.

  3. Weathered wood shake roof stretching up to a ridge with a small chimney against blue sky
    3

    How the work days go

    We cover plantings and decks with tarps, protect windows near the work and set the dumpster on boards. The crew strips and dries in one section at a time, so the house is never left open overnight. If the forecast turns, we decide the evening before and tell you, rather than starting a slope we cannot finish.

    Each afternoon the yard, driveway and beds get a magnetic sweep. On the last day, a crew lead checks every detail against a written list, then Tom or an estimator walks it again with you. Photos and warranty registrations follow by email within the week.

Signs your roof is near the endLogbook

  • Shingles curling, cracking or missing after windstorms
  • Granules collecting in gutters and at downspout outlets
  • Water stains on ceilings after nor'easters, even if it stops
  • Rust streaks from fasteners or flashing
  • A roof over 20 years old that has needed several repairs

Always part of the job

  • Full tear-off to the deck on every job
  • Rotted decking replaced at a price written into your estimate
  • Ice and water shield run well past code at the eaves
  • Stainless or hot-dipped fasteners near salt water
  • High-wind nailing on exposed and waterfront homes
  • 15-year workmanship warranty on full replacements
White two-story colonial house with dormers, black shutters and twin brick chimneys on a lawn

Roof Replacement questions

How long does a replacement take?

Two to three days for most Capes and ranches, three to five for large colonials or complex roofs. Weather can add days, and we will always tell you the plan before we start.

Can you roof over my existing shingles?

Massachusetts code allows it in limited cases, but we do not recommend it. A tear-off lets us fix the deck, install ice shield properly and gives you a full manufacturer warranty.

Do you handle the permit?

Yes. We pull the building permit for every replacement and schedule any required inspections.

Get a Roof Replacement Quote

No obligation. We respond within 24 hours.

No obligationReply within 24 hrsLicensed & insured
Reviews

What Customers Are Saying

★★★★★
Tom walked our 1790 Cape with us, explained the historic commission process and handled the whole application. The new cedar roof looks like it has always been there. The crew was careful with our gardens.
E&Ellen & Mark T.Gannet Point · Cedar Shake Roofing
★★★★★
Our waterfront house takes a beating. They recommended aluminum standing seam and stainless everything. Two nor'easters later, not a drip, and it looks fantastic.
PSPriya S.Heron Neck · Metal Roofing
★★★★★
We live out of state most of the year. They sent photos every day, handled access with our neighbor and finished before we came up in June. Completely trustworthy.
JMJoan M.Cobb's Landing · Roof Replacement
More services

Related Services

Call NowFree Estimate